
Work Log

I'm always saying I have a lot to do, but until I decided to start recording it, I had no idea! This is the reason I'll only work on my own stuff for now. Items are in the order I expect to complete them in.
| Gyruss |
| ToDo: |
Started |
Completed |
| Remove Control Panel | | May, 2003 |
| Dissassemble Control Panel | | May, 2003 |
| Replace Control Panel Overlay & Add New Parts | | May, 2003 |
| Remove Trim Parts | | May, 2003 |
| Paint Trim Parts | | May, 2003 |
| Paint new coin door | | Sept, 2003 |
| Wire new coin door with old wiring | | |
| Bondo broken lower side | | Oct 2003 |
| Paint Art on Sides | Oct, 2003 | |
| Clear Coat Sides | | |
| Move new Monitor into old frame | | |
| Replace T-Mouldling | | |
| Cut replacemenr back door to fit and paint | | |
| Polish or replace Plexi | | |
| Install wheels on bottom | | |
| Reassemble Machine | | |
| Gottlieb Black Hole |
| ToDo: |
Started |
Completed |
| Remove plastics from Upper Playfield | | Oct, 2003 |
| Remove plastics from lower playfield | | |
| Touch Up Playfields | | |
| Have Playfields Clearcoated | | |
| Rebuild all of the electronics | | |
| Bally Strikes and Spares |
| ToDo: |
Started |
Completed |
| Order power board repair parts | | |
| Replace power board parts | | |
| Fix various weak connections | | |
| Gottlieb Circus |
| ToDo: |
Started |
Completed |
| Touch Up Playfields | | |
| Polish Playfield | | |
| Rebuild all of the electronics | | |
| Multi Pac |
| ToDo: |
Started |
Completed |
| Acquire new side art | | Sept,2003 |
| Sand Down sides | | |
| Replace Side Art | | |
| Berzerk |
| ToDo: |
Started |
Completed |
| Fix Booting Problem | | |
| Acquire New Control Panel | | |
| Replace Control Panel | | |
| Zoo Keeper |
| ToDo: |
Started |
Completed |
| Bondo hole in front of cabinet | | |
| Repaint art. | | |
| Clearcoat painted art. | | |
| Monster Bash |
| ToDo: |
Started |
Completed |
| Acquire new side art | | May 2003 |
| Acquire new side rails | | |
| Replace side art and rails | | |
Recently Completed
| Twilight Zone |
| ToDo: |
Started |
Completed |
| Remove all parts from playfield (top and bottom) | | 11/26/03 |
| Polish playfield | | 11/27/03 |
| Clean all parts | | 11/28/03 |
| Re-Assemble (I took my time / made enhancements) | 11/30/03 | 12/19/03 |
| Re-Rebuild Clock (Shortcuts are not) | | 12/27/03 |
| Space Duel |
| ToDo: |
Started |
Completed |
| Order Cap Kit | | Nov, 2003 |
| Remove Monitor | | 12/22/03 |
| Install Cap Kit | 12/24/03 | 12/25/03 |
Please check regularly for changes.
Thanks for looking!